Newburgh Engineering, Derbyshire (Phase 1)
Client: Camstead Homes | Location: Bradwell, Derbyshire
Phase 1
Metropolitan Demolition were commissioned to carry out the demolition of the Derbyshire based (former) engineering works, the project involved the separation of buildings using a selection of hand-held demolition tools and hot works. A partial demolition of the workshop was conducted and the slab and foundation were removed. The team extracted and removed Notifiable asbestos from the site.